Projects / Space Florida Infrastructure Improvements
Critical Infrastructure · Completed

Space Florida Infrastructure Improvements

Project Overview

Construction of critical infrastructure at Kennedy Space Center, including approximately two miles of force main, an 8-foot by 20-foot polymer lift station, directional drilling, replacement of existing water mains, storm drainage systems, dewatering operations, and multiple triple-barrel 42-inch RCP crossings beneath active roadways.

By the numbers

~2 miles
force main
8' × 20'
polymer lift station
42"
triple-barrel RCP crossings under active roads